Commit graph

4 commits

Author SHA1 Message Date
BtbN
cf0e697d13 fix: Actions workflows triggered by comments or labels to pull requests may access secrets (#9003)
This avoids issue_comment events on pull requests to get that flag set and subsequently not get access to secrets.

### Tests

- I added test coverage for Go changes...
  - [x] in their respective `*_test.go` for unit tests.
  - [ ] in the `tests/integration` directory if it involves interactions with a live Forgejo server.
- I added test coverage for JavaScript changes...
  - [ ] in `web_src/js/*.test.js` if it can be unit tested.
  - [ ] in `tests/e2e/*.test.e2e.js` if it requires interactions with a live Forgejo server (see also the [developer guide for JavaScript testing](https://codeberg.org/forgejo/forgejo/src/branch/forgejo/tests/e2e/README.md#end-to-end-tests)).

### Documentation

- [ ] I created a pull request [to the documentation](https://codeberg.org/forgejo/docs) to explain to Forgejo users how to use this change.
- [x] I did not document these changes and I do not expect someone else to do it.

### Release notes

- [ ] I do not want this change to show in the release notes.
- [x] I want the title to show in the release notes with a link to this pull request.
- [ ] I want the content of the `release-notes/<pull request number>.md` to be be used for the release notes instead of the title.

<!--start release-notes-assistant-->

## Release notes
<!--URL:https://codeberg.org/forgejo/forgejo-->
- Bug fixes
  - [PR](https://codeberg.org/forgejo/forgejo/pulls/9003): <!--number 9003 --><!--line 0 --><!--description QWN0aW9ucyB3b3JrZmxvd3MgdHJpZ2dlcmVkIGJ5IGNvbW1lbnRzIG9yIGxhYmVscyB0byBwdWxsIHJlcXVlc3RzIG1heSBhY2Nlc3Mgc2VjcmV0cw==-->Actions workflows triggered by comments or labels to pull requests may access secrets<!--description-->
<!--end release-notes-assistant-->

Reviewed-on: https://codeberg.org/forgejo/forgejo/pulls/9003
Reviewed-by: Earl Warren <earl-warren@noreply.codeberg.org>
Co-authored-by: BtbN <btbn@btbn.de>
Co-committed-by: BtbN <btbn@btbn.de>
2025-08-25 20:11:45 +02:00
Gusted
2457f5ff22 chore: branding import path (#7337)
- Massive replacement of changing `code.gitea.io/gitea` to `forgejo.org`.
- Resolves forgejo/discussions#258

Reviewed-on: https://codeberg.org/forgejo/forgejo/pulls/7337
Reviewed-by: Earl Warren <earl-warren@noreply.codeberg.org>
Reviewed-by: Michael Kriese <michael.kriese@gmx.de>
Reviewed-by: Beowulf <beowulf@beocode.eu>
Reviewed-by: Panagiotis "Ivory" Vasilopoulos <git@n0toose.net>
Co-authored-by: Gusted <postmaster@gusted.xyz>
Co-committed-by: Gusted <postmaster@gusted.xyz>
2025-03-27 19:40:14 +00:00
TheFox0x7
4de909747b Add testifylint to lint checks (#4535)
go-require lint is ignored for now

Reviewed-on: https://codeberg.org/forgejo/forgejo/pulls/4535
Reviewed-by: Gusted <gusted@noreply.codeberg.org>
Co-authored-by: TheFox0x7 <thefox0x7@gmail.com>
Co-committed-by: TheFox0x7 <thefox0x7@gmail.com>
2024-07-30 19:41:10 +00:00
Earl Warren
7b4dba3aa0 [ACTIONS] skip superflous pull request synchronized event (#2314)
Skip a HookEventPullRequestSync event if it has the same CommitSHA as an existing HookEventPullRequest event in the ActionRun table. A HookEventPullRequestSync event must only create an ActionRun if the CommitSHA is different from what it was when the PR was open.

This guards against a race that can happen when the following is done in parallel:

* A commit C is pushed to a repo on branch B
* A pull request with head on branch B

it is then possible that the pull request is created first, successfully. The commit that was just pushed is not known yet but the PR only references the repository and the B branch so it is fine.

A HookEventPullRequest event is sent to the notification queue but not processed immediately.

The commit C is pushed and processed successfully. Since the PR already exists and has a head that matches the branch, the head of the PR is updated with the commit C and a HookEventPullRequestSync event is sent to the notification queue.

The HookEventPullRequest event is processed and since the head of the PR was updated to be commit C, an ActionRun with CommitSHA C is created.

The HookEventPullRequestSync event is then processed and also has a CommitSHA equal to C.

Refs: https://codeberg.org/forgejo/forgejo/issues/2009
Reviewed-on: https://codeberg.org/forgejo/forgejo/pulls/2314
Co-authored-by: Earl Warren <contact@earl-warren.org>
Co-committed-by: Earl Warren <contact@earl-warren.org>
2024-02-11 13:06:54 +00:00